Great to see the first rings being installed for the catch pit on the Climafuel project. The pit is 3m wide and over 6m deep.
Well done to Alex and Will who are doing a great job and to the 21t Hitachi which is working like a dream.
Great to see the first rings being installed for the catch pit on the Climafuel project. The pit is 3m wide and over 6m deep.
Well done to Alex and Will who are doing a great job and to the 21t Hitachi which is working like a dream.