Lillyhall Infrastructure Works, Whitehaven, Cumbria

Contract Title: Peaking Energy Plants
Client: A G Renewables (AGR)
Value: £2,756,000
Date: June 2017 – April 2019

Scope of Work
There were eight Peaking Energy Projects included in the package of work. Askam designed and constructed the infrastructure which included:

  • All earthworks and demolition prior to works starting on site. On one site this included dealing with Asbestos.
  • All 278 works including alterations to access roads and paving
  • Reinforced Concrete foundations for the new Energy Plant
  • Ducting, Drainage, Manholes and Attenuation where required
  • RC Structures for the Transformers, Gensets and Gas meter housing
  • Construction of the DNO Substation
  • RC, Gabion and Legio Block Retaining walls
  • All external hard standings in concrete, tarmac, gravel and associated drainage.
  • Perimeter Fencing