New Years Bridge
This project was to upgrade the Overflow facilities at the reservoir.
This involved the construction of an extensive spillway over the existing embankment. The existing spillway was utilised for the Dowry by-pass and the New Years Bridge scour flows which eventually connected to the new structure.
The existing wave wall was removed and a new wave wall and crest access constructed and tied into the clay core to prevent seepage.